NameCategoryVersionSubmissionsLast submittedOwnerAudit ID
Pre-Task Plan — ExcavationSafetyv3.2.1412May 17S. Okafor (Safety)frm_ptp_excavation
Daily Report — SuperintendentField Opsv5.0.0287May 17M. Rodriguez (Field)frm_dlr_super
JHA — Hot WorkEHSv2.4.096May 16S. Okafor (Safety)frm_jha_hot_work
QA Checklist — Concrete PourQualityv4.1.054May 17P. Shah (QA)frm_qa_concrete_pour
QA Checklist — Steel ErectionQualityv3.0.247May 17P. Shah (QA)frm_qa_steel_erection
Daily Tailgate BriefingSafetyv1.7.0142May 17S. Okafor (Safety)frm_dly_brief
OSHA 300 Incident FormCompliancev1.0.00NeverS. Okafor (Safety)frm_osha_300
Pre-Pour InspectionQualityv2.2.038May 17P. Shah (QA)frm_pre_pour
Lock-Out / Tag-Out AuthorizationEHSv2.0.071May 15S. Okafor (Safety)frm_lockout
Confined Space Entry PermitEHSv3.0.022May 16S. Okafor (Safety)frm_confined_entry

Recent submissions

SubmittedFormByAreaStatusSummaryAudit ID
May 17, 2:02 PMPre-Pour InspectionPriya ShahLevel B2 — south bayApprovedRebar ties + cover OK. Embeds verified per drawing S-204.frs_3G5N2T0V6Q
May 17, 1:48 PMQA Checklist — Steel ErectionPriya ShahLevel 12 — perimeterApprovedFull-pen welds at column line G complete; UT scheduled tomorrow.frs_5R0F1H8B4N
May 17, 12:14 PMPre-Task Plan — ExcavationMarcus RodriguezCooling tower padApprovedExcavation 6'-3" — shoring plan attached. No utilities in path.frs_9KZ4M8X2T1
May 16, 6:11 PMJHA — Hot WorkSam OkaforLevel 04 — MEPApprovedHot work permit issued, fire watch posted, extinguisher staged.frs_8C2D9V5R0T
May 15, 7:08 PMLock-Out / Tag-Out AuthorizationSam OkaforSwitchgear vaultApprovedPG&E feed isolated for 4000A switchgear staging.frs_4M3N0K6S2Y