BUILD · FORMS

Forms

2 templates · 10 recent submissions · 0 today

Form library

Templates ready for submission
NameCategoryVersionSubmissionsLast submittedOwnerAudit ID
Pre-Task Plan — ExcavationSafetyv3.2.1412May 17S. Okafor (Safety)frm_ptp_excavation
Daily Tailgate BriefingSafetyv1.7.0142May 17S. Okafor (Safety)frm_dly_brief

Recent submissions

SubmittedFormByAreaStatusSummaryAudit ID
May 17, 10:42 PMDaily Report — SuperintendentJordan EllisSite-wideSubmittedSteel topped out Level 12. Conduit clash open at gridline H7.frs_0W9X4F2J3M
May 17, 6:24 PMQA Checklist — Concrete PourMarcus RodriguezLevel B2 — south baySubmittedSlump 4.5". 4 cylinders cast — 7d, 14d, 28d, hold.frs_1K4L7B6X2Y
May 17, 2:02 PMPre-Pour InspectionPriya ShahLevel B2 — south bayApprovedRebar ties + cover OK. Embeds verified per drawing S-204.frs_3G5N2T0V6Q
May 17, 1:48 PMQA Checklist — Steel ErectionPriya ShahLevel 12 — perimeterApprovedFull-pen welds at column line G complete; UT scheduled tomorrow.frs_5R0F1H8B4N
May 17, 12:14 PMPre-Task Plan — ExcavationMarcus RodriguezCooling tower padApprovedExcavation 6'-3" — shoring plan attached. No utilities in path.frs_9KZ4M8X2T1
May 17, 11:35 AMDaily Tailgate BriefingSam OkaforSite-wideSubmitted142 personnel on site, 4 sub crews. Hot work in Level 04 zone.frs_2YJ7P6W0L8
May 16, 6:11 PMJHA — Hot WorkSam OkaforLevel 04 — MEPApprovedHot work permit issued, fire watch posted, extinguisher staged.frs_8C2D9V5R0T
May 16, 4:55 PMConfined Space Entry PermitSam OkaforSump pit · Level B2In progressAtmosphere readings logging; rescue plan attached.frs_6P1Q8H7Z5L
May 15, 7:08 PMLock-Out / Tag-Out AuthorizationSam OkaforSwitchgear vaultApprovedPG&E feed isolated for 4000A switchgear staging.frs_4M3N0K6S2Y
May 13, 8:17 PMQA Checklist — Concrete PourMarcus RodriguezLevel B1 — north bayRejectedSlump out of tolerance (6.5"). Pour rejected, retake scheduled.frs_7B5J4E1V9D