| May 17, 2:02 PM | Pre-Pour Inspection | Priya Shah | Level B2 — south bay | Approved | Rebar ties + cover OK. Embeds verified per drawing S-204. | frs_3G5N2T0V6Q |
| May 17, 1:48 PM | QA Checklist — Steel Erection | Priya Shah | Level 12 — perimeter | Approved | Full-pen welds at column line G complete; UT scheduled tomorrow. | frs_5R0F1H8B4N |
| May 17, 12:14 PM | Pre-Task Plan — Excavation | Marcus Rodriguez | Cooling tower pad | Approved | Excavation 6'-3" — shoring plan attached. No utilities in path. | frs_9KZ4M8X2T1 |
| May 16, 6:11 PM | JHA — Hot Work | Sam Okafor | Level 04 — MEP | Approved | Hot work permit issued, fire watch posted, extinguisher staged. | frs_8C2D9V5R0T |
| May 15, 7:08 PM | Lock-Out / Tag-Out Authorization | Sam Okafor | Switchgear vault | Approved | PG&E feed isolated for 4000A switchgear staging. | frs_4M3N0K6S2Y |