OVERSIGHT
Quality
AV
Lifecycle
OntologyPortfolio—Prometheus VenturesProgram—Atlanta Multifamily Fund III
  • Schedule
  • Reality Capture
  • Field Productivity
  • Equipment
  • Materials
  • Timecards
  • Resource Planning
  • Progress
  • 4D Variance
  • Quality
  • RFIs
  • Documents & Library
  • Submittals
  • Drawings
  • Budget
  • Commitments
  • Change Management
  • Safety
  • Daily Log
  • Invoicing
  • Prime Contracts
  • Vendors
  • Workforce
  • Photos
  • Forms
Capital
  • Pro Forma
  • Capital Stack
  • Bonds
DELIVERY

Quality

14 open · 92% passing

Project operating path

Atlas Tower1234 Peachtree St NE, Atlanta GA
BUILD · QUALITY

Quality

InspectionsObservationsNew inspectionNew observation
14open observations3critical92%QA inspections passing
Sample data — connect a live data source (services/quality).

Field today

Tablet · one-tap
Walkthroughs
3scheduled today
Start walkthrough →
Observation
14open in field
Log observation →
Signoffs
4awaiting
Review queue →
Overdue
2inspections

Open by severity

View all observations →
SEV 1 · Informational2
SEV 2 · Low4
SEV 3 · Medium4
SEV 4 · High1
SEV 5 · Critical3

Open issues by area

4 active locations
Level B2 — slab pour
3open · 1 critical
Walkthrough today
Level 04 — MEP rough-in
5open · 1 critical
Due tomorrow
Level 07 — drywall
4open · 0 critical
Due in 2d
Roof — flashing
2
Closed this month24Observations resolved in the last 30 days.
Inspections due7Within the next 7 days.
Inspections overdue2Action required. Reassign or extend.
Reassign →
open · 1 critical
Walkthrough today