Inspections
8 inspections
Sample data — connect a live data source (services/quality).
| Template | Project | Status | Items | Executed | Inspector |
|---|---|---|---|---|---|
| Concrete Pour Pre-Inspection — Mat Foundationv3 | Clinch River BWRX-300 | Submitted | 26/303 fail | 2026-04-30 | J. Reyes |
| MEP Rough-In Quality — Containment Bldgv2 | Clinch River BWRX-300 | In Progress | 12/241 fail | 2026-05-02 sched. | T. Patel |
| Drywall Hang Inspection — Control Bldgv1 | Clinch River BWRX-300 | Scheduled | 0/18 | 2026-05-05 sched. | — |
| Containment Liner Weld QAv4 | Clinch River BWRX-300 | Submitted | 142/1508 fail | 2026-04-28 | M. Lee |
| Embed Plate Position Check (post-pour)v2 | Clinch River BWRX-300 | Submitted |