New inspection
Schedule the inspection record. The checklist completion is filled in the field on the inspection detail surface.
Identification
Project, title, and type.
Project the inspection belongs to.
At least 3 characters.
Location & schedule
Where the inspection is happening and when.
24-hour format (HH:MM).
References
Optional spec section and drawing references for traceability.
e.g. 03 31 00
One drawing number per line
Draft