Foresight · BASELINE
Value Engineering
Project operating path
Back
Value Engineering
VE proposals with savings, risk, lifecycle delta, and the decision audit trail. Adopted proposals roll into the budget reconciliation strip.
Roadmap
VE proposal log
Originator, date raised, status, and chronological audit.
Savings + lifecycle delta
Initial savings estimate paired with 30-year lifecycle cost delta.
Risk + schedule impact
Risk classification (low/med/high) and schedule-impact assessment per proposal.
Decision audit trail
Owner / architect / GC decisions, evidence references, sign-offs.
Adopted-VE budget rollup
Accepted-only adopted-VE total reconciled against the GMP budget.
No VE proposals open
Once the VE proposal log API lands, accepted, rejected, and pending proposals will appear here with full lifecycle + lineage.