Clashes
56
18 high priority
Envision · Foresight
Project operating path
Clashes
56
18 high priority
Decision age
5d
median open item
CD readiness
82%
package maturity
Schedule variance
-4d
design critical path
SD/DD/CD reviews, A/E RFIs, design schedule, BIM clash resolution, and the decision log.
A/E RFIs
31
MEP coordination heavy
BIM clash
56
18 critical
Decision log
12
ownership actions pending
Is the design deliverable as drawings on the schedule we need?
Module views
| Subject | Owner | Basis | Status |
|---|---|---|---|
| Shaft coordination | MEP | 18 clashes | Resolve |
| Facade embeds | Structural | RFI-AE-044 | Review |
| Kitchen exhaust | Architect | Option B | Approved |
South Harbor (SH-2042) · Savannah
Next action: RFI-0142 door head detail