BASELINE

Foresight

FORESIGHT · Stage landing

Foresight

Concept · design · estimating · bidding · VE · procurement · risk.
Open bid packages7Open · leveled · draft
Bids due ≤7d1Estimator critical path
Estimates active4Draft + in-review GMPs
Top variance vs EE+4.8%South Harbor Tower
Clashes open3MEP + structural + arch
Long-leads tracked3≥12 wk · schedule risk
VE savings GTD$312KAccepted this cycle
ACROSS ALL PROJECTS

Preconstruction cockpit register

Every actionable DESIGN-stage item — click through to the module.
20 items across 4 active preconstruction efforts · reference date 2026-05-24
KindItemProjectStatusOwnerDate
Bid pkgBP · Structural Steel Erection · CSI 05 · EE $9.84MSouth Harbor TowerOpen · due 2026-05-29p.morales@envsn.com2026-05-29Open →
Bid pkgBP · Site Mass Grading + Earthwork · CSI 31 · EE $3.20MHelios Logistics ParkOpen · due 2026-05-20 (PAST)p.morales@envsn.com2026-05-20Open →
Bid pkgBP · Curtain Wall Unitized System · CSI 08 · EE $26.7MSouth Harbor TowerDraft · pending scopep.morales@envsn.com2026-05-22Open →
Bid pkgBP · Tower Crane Rental · CSI 01 · EE $720KK Street GarageLeveled · ready to awardp.morales@envsn.com2026-05-21Open →
Bid pkgBP · Concrete Pour Package · CSI 03 · EE $2.90MK Street GarageAwarded · 2026-03-20 · Baker Concretep.morales@envsn.com2026-03-20Open →
EstimateEST · K Street GMP v3 · $48.2M · -2.1% vs priorK Street GarageApproved · GMP signed 2026-03-04j.tran@envsn.com2026-03-04Open →
EstimateEST · South Harbor Precon · $312M · +4.8% over EESouth Harbor TowerIn Review · variance flaggedj.tran@envsn.com2026-05-22Open →
EstimateEST · Helios GMP v1 · $76.4M · within toleranceHelios Logistics ParkDraft · pending sub bidsj.tran@envsn.com2026-05-19Open →
EstimateEST · Clinch River ROM · $4.18B · ±15% Class 4TVA Clinch River BWRX-300In Review · TVA committeej.tran@envsn.com2026-05-17Open →
ClashClash · L38 mech room — duct vs structural beam (14 inst.)South Harbor TowerOpen · routed to MEP+SEk.lee@envsn.com2026-05-22Open →
ClashClash · Roof penetration — sprinkler vs HVAC riserHelios Logistics ParkOpen · awaiting RFI responsek.lee@envsn.com2026-05-21Open →
ClashClash · L4 garage core — embed plate vs PT tendonK Street GarageApproved · revised drawing R3k.lee@envsn.com2026-05-19Open →
ClashClash · Curtain wall anchor — tolerance vs slab edgeSouth Harbor TowerPending · contractor mock-upk.lee@envsn.com2026-05-20Open →
ProcurePROC · Elevator package · 38-week lead · SchindlerSouth Harbor TowerIssued · PO awaiting confirmationm.osei@envsn.com2026-05-22Open →
ProcurePROC · Tilt panel embed plates · 22-week leadHelios Logistics ParkAwaiting · final shop drawingsm.osei@envsn.com2026-05-20Open →
ProcurePROC · Reactor pressure vessel · 124-week lead · GE-HTVA Clinch River BWRX-300Overdue · TVA approval gatem.osei@envsn.com2026-05-15Open →
VEVE · Curtain wall alternative · $1.84M savingsSouth Harbor TowerProposed · pending owner reviewp.morales@envsn.com2026-05-21Open →
VEVE · MEP riser consolidation · $312K savingsK Street GarageAccepted · folded into GMPp.morales@envsn.com2026-05-16Open →
RiskRISK · Rate-shock scenario · +150bps · IRR -2.4%South Harbor TowerTracked · monthly re-rund.park@envsn.com2026-05-23Open →
RiskRISK · Steel-tariff scenario · +12% · est +$420KHelios Logistics ParkTracked · sub bid escalator addedd.park@envsn.com2026-05-22Open →
RECENT ACTIVITY

Last 24 hours

Bidding · estimating · coordination · procurement — most recent first.
2026-05-24 10:08P. Moralesleveled BP · Tower Crane Rental (K Street, $720K, 3 bids)
2026-05-23 17:22J. Tranflagged variance on EST · South Harbor Precon (+4.8% over EE, $312M)
2026-05-23 14:46K. Leeopened clash item for L38 mech room — duct vs structural beam (14 inst.)
2026-05-22 16:12M. Oseiissued PO for PROC · Elevator package (South Harbor, Schindler, 38wk)
2026-05-22 11:01P. Moralesproposed VE on Curtain wall alternative (South Harbor, $1.84M savings)