Sample data — connect a live data source (services/rfis).
Build · Field clarifications

RFIs

5open13overdue0due in 3d
Standard CRENew RFI
Showing 13 RFIs · Overdue
RFI-0138Curtain wall anchor CW-7 — confirm embed depth tolerance
  1. 1Submitted
  2. 2Under Review
  3. 3Response Drafted
  4. 4Approved
  5. 5Closed
RFI #TitleSpecStatusBall in courtDueCost impact
RFI-0142Door 7B head height conflicts ceiling cloud A-301 Rev B08 11 00OpenSmith & Assoc. Architecture38d late
RFI-0141Slab pour 2L — embed plate EP-12 grid C.5 off design03 30 00PendingCarter Structural36d late$18,500.00no schedule hitUSD
RFI-0140MEP routing above corridor B clashes light cove L323 31 00RespondedEnvision GC31d late$4,250.00no schedule hitUSD
RFI-0138Curtain wall anchor CW-7 — confirm embed depth tolerance08 44 00OpenSkidmore Architects54d late$91,000.00+5d scheduleUSD
RFI-0143Fireproofing thickness col. C7 — 2hr rating per UL X77207 81 00RespondedEnvision GC26d late$3,120.00no schedule hitUSD
RFI-0144Roof drain RD-4 setting — confirm 1/4"/ft slope to overflow22 14 23PendingHenderson MEP Engineers18d late
RFI-0145Sheet S2.04 — bolt spec for grid line 4 column anchor05 50 00OpenCarter Structural17d late
RFI-0150Foundation pad F-21 — rebar cover < 3" min per ACI 31803 20 00OpenHalverson Civil51d late$26,750.00+3d scheduleUSD
RFI-0151Transformer pad anchor bolt template — verify pattern T2-A26 12 19PendingHenderson MEP Engineers20d late$5,400.00no schedule hitUSD
RFI-0152Switchgear pad expansion joint — sealant compatibility w/ oil07 92 00RespondedEnvision GC24d late$1,840.00no schedule hitUSD
RFI-0153Grounding grid trench depth — utility requires 30" not 24"26 05 26OpenLoxsle Development (owner)44d late$42,200.00+4d scheduleUSD
RFI-0154Yard lighting pole base — drilled-pier vs. spread footing26 56 00PendingHalverson Civil15d late$780.00no schedule hitUSD
RFI-0156Fire-rated penetration seal at cable tray CT-3 — UL listing07 84 00RespondedEnvision GC14d late$965.00no schedule hitUSD