Loading content
OVERSIGHT
Daily Log
Search or jump…
⌘K
AV
DELIVERY
Daily Log
Main Office Tower Excavation · May 14, 2026
Project operating path
Atlas Tower
1234 Peachtree St NE, Atlanta GA
Build · Daily Log
/
May 14, 2026
Main Office Tower Excavation — May 14, 2026
Submitted
Atlanta, GA · Midtown
PwC TAGGED
#000003 · v2
AM · PM
Partly Cloudy
·
Clear
HIGH (°F)
81.0
LOW (°F)
64.0
WIND (MPH)
6.0
PRECIP (IN)
0.00
HUMIDITY %
52
SOURCE
NOAA · GHCND
Manpower
28 workers · 224.0 manhours
Subcontractor
Trade
Crew
Hours
Notes
Audit
Barrett Excavation
Mass excavation
18
144.0
Bench 3 cut to el. 102.5; bottom-of-cut surveyed.
#000300 · v1
Southern Shoring
Shoring — soldier piles
7
56.0
Lagging at piles 14-19 — eng QC pending.
#000301 · v1
Atlanta Survey Group
Survey / layout
3
24.0
BOC + control points shot — log to Trimble.
#000302 · v1
Equipment
2 units
Type
Description
Qty
Hours
Operator
Notes
Audit
Excavator — 50-ton
CAT 349 — bench 3 east
2
10.0
Barrett Excavation
Normal ops.
#000330 · v1
Articulated Hauler
Volvo A40G — spoil to off-site
4
40.0
Barrett Excavation
Manifest 8821-8824 attached.
#000331 · v1
Productivity
2 cost codes
Cost code
Description
Planned
Actual
Unit
MH
PF
Audit
31 23 16.001
Mass excavation — Bench 3
850
905
CY
144.0
1.06
#000370 · v1
31 41 16.002
Soldier pile lagging — bench 3
8
7.5
EA
56.0
0.94
#000371 · v1
Delays
0 records
Type
Duration
Responsible
Description
Linked RFI
Audit
No delays recorded for this day.
Deliveries
0 records
Vendor
Material
Qty
Unit
Delivered
Received by
Audit
No deliveries logged.
Visitors
0 records
Name
Company
Purpose
Arrived
Departed
Audit
No site visitors today.
General notes
Bench 3 east at design grade. Survey shot to Trimble — el. delta 0.02ft. Cleanup + grade-stake reset for layout 0500 next AM.