Concrete Pour Pre-Inspection
v3Total5
Pass3
Fail1
N/A1
Checklist
Formwork is plumb and braced per spec.
Reinforcement placement matches drawings.
Concrete cover meets minimum requirements.
Evidence photos
Photo evidence required for failures.
Embeds and anchors located per shop drawings.
Adjacent existing concrete is wetted before pour.
Observations from this inspection
Sign-off
signature on file
J. Reyes · 2026-04-30 11:14 UTC