Concrete pump truck setup and pour
ActiveRiverbend Tower · Concrete
TaskConcrete placement (slab on grade)
Created2026-04-15
Last reviewed2026-04-20 · L. Garcia
Required PPE
- Hard hat (Type II)
- ANSI Class 2 hi-vis vest
- Safety glasses
- Steel-toe boots
- Cut-resistant gloves (ANSI A4)
Required training
- Concrete pump operator certification
- Site-specific orientation
- OSHA 10/30
Permits
- Hot work permit (if welding rebar)
Task steps and hazards
- STEP 1
Position pump truck and set outriggers on stable ground.
Hazard Sev × Lik Risk Controls hierarchy Truck tipping due to unstable ground.
- ENGVerify ground bearing capacity; use outrigger pads.
- ADMINDesignated spotter during outrigger deployment.
5 × 2 High · 10 - 1ELIM
- 2SUB
- 3ENG
- 4ADMIN