CLOSEOUT · AS-BUILTS

Verify against site reality

Surveyor sign-off that the record sheet matches what's actually built.

Sheet

Which record sheet this verification applies to.

Native sheet handle from the record set.

Surveyor

Who walked the site and on what date.

Licensed surveyor of record.

Date the walk-through was performed.

Match grade

Grade the sheet against site reality.

Major variance triggers a re-issue cycle.

Cite measured deltas, photo IDs, and proposed reconciliation path.

Photographs

Verification photo set. Uploader plugs in here when wired.

Attach surveyor photographs and field notes here. (Uploader wires in after Wave D — photo IDs persist with this verification record once available.)
Draft